Cambambe, Angola

The project consists in the expansion of the existing hydroelectric power station Cambambe I by a second turbine house (Cambambe II). After the expansion the power station will have a total capacity of about 960 MW. The power station is to meet the rising energy demand in Angola.

More detailed information on the environmental impacts of the project can be found in the environmentar impact study.

If required, additional information can be requested via email at info@exportkreditgarantien.de

The Cambambe project is classified as a category A-project with respect to its environmental impact.

The project is reinsured by EKN.

Document

Eia Cambambe Environmental Impact Study 2013