Transactions with Environmental and Social Impact Assessment

EKN classifies transactions with medium and long-term credit periods into categories A, B or C according to their environmental and social risk. Category A transactions involve a significant risk, while category B transactions involve some risk.

For category A-projects, an Environmental and Social Impact Assessment (ESIA) will be made public by EKN at least 30 days before final commitment is issued. This procedure is in accordance with the OECD Recommendation on Common Approaches to the Environment and Officially Supported Export Credits.

 

Pending Environmental and Social Impact Assessment reports:

--------------------------------------------------------------------------------------------------------

Oyu Tolgoi, Mongolia

Published: Dec. 20, 2013

This project is reinsured by EKN.

The project is a copper and gold mine in Mongolia. Detailed information on the

environmental and social impacts from the project is available at:

http://ifcext.ifc.org/ifcext/spiwebsite1.nsf/ProjectDisplay/ESRS29007


CMPC Guaiba 2 – Pulp Mill Project in Brazil

Published: Nov. 20, 2013

Related documents:

1. EKN Summary of the E&S review CMPC Guaiba 2

2. Environmental and Social Due Diligence Report CMPC Guaiba 2 Project Environ

3. Environmental and Social Action Plan CMPC Guaiba (13 11 13)

 

Archive 2013

 --------------------------------------------------------------------------------------------------------

Cambambe, Angola

The project consists in the expansion of the existing hydroelectric power station Cambambe I by a second turbine house (Cambambe II). After the expansion the power station will have a total capacity of about 960 MW. The power station is to meet the rising energy demand in Angola.

More detailed information on the environmental impacts of the project can be found in the environmentar impact study.

http://www.agaportal.de/en/aga/projektinformationen/a-projekte.html#angola

If required, additional information can be requested via email at mailto:info@exportkreditgarantien.de

The Cambambe project is classified as a category A-project with respect to its environmental impact.

The project is reinsured by EKN.

--------------------------------------------------------------------------------------------------------

Surgil Project, Uzbekistan

EKN has received an application to support a Swedish export transaction to Uzbekistan. The full project includes:

  • Drilling and development of gas production wells at the Surgil Field, south of the Aral sea in Uzbekistan
  • Transport via 150 km pipelines
  • Construction and operation of a petrochemical complex with associated infrastructure, i.e. raw water supply line connection, rail and road connection, workers camp etc.

The final products are mainly high-density polyethylene (HDPE) and polypropylene (PP). In addition, gas will be sold.

The Surgil project is classified as a category A-project with respect to its environmental impact. EKN is therefore making the project´s Environmental and Social Impact Assessment (ESIA) publicly available.